The primary overriding situations have to do with topographic references
in the field notes. These are always given precedence. If the line
should follow a certain ridge then your resurvey must keep the line
right on the ridge.
To determine the rotation in angle of a grant boundary as well
as the over all change in scale, two primary lines are used to base
proportional calculations. One of these is a line from the starting
identified control corner to the final location at the end of your
record resurvey.
It is called the record connecting line.